Project Layout
Microtunneling projects should be laid out with attention to the benefits and constraints unique to this construction process. The following recommendations address some of these concerns:...

Shaft Considerations
Jacking and receiving shaft locations should be selected to minimize the number of shafts and disruptions while not exceeding the practical limits of the drive lengths achievable for a...

Microtunneling Operation
The shaft should provide safe working conditions and fully support the ground. Jacking and receiving shaft support system and sizes are typically determined by the contractor. See Chapter...

Shafts/Temporary Structures
Shafts should be of a size to accommodate the equipment and pipe selected and to allow for safe working practices. If the shaft must accommodate the permanent works, it is the contractor's...

The Joint Industry Development of a Recommended Practice for the Site Specific Assessment of Mobile Jackup Units
The mobile self-elevating (drilling) unit, or jack-up, has been central to the exploration and development of offshore oil and gas reserves. In recent years there has been an increased...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years
Prepared by the Program Committee of the Offshore Technology Conference of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Offshore Technology in Civil Engineering
Hall of Fame Papers From the Early Years
Prepared by the Program Committee of the Offshore Technology Conference of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Seven
Prepared by the Program Committee of the Offshore Technology Conference of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Six
Prepared by the Program Committee of the Offshore Technology Conference of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Five
Prepared by the Program Committee, Offshore Technology Conference, of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Grout Hole Layout
The drilling method, either rotary or percussion, and the type and size of the drills to be used are selected based on such factors as rock type, depth of holes required, working space...

Grout Placement Operations
This chapter discusses grout placement operations. The procedures for drilling, proportioning and mixing, and injection used in underground grouting are basically the same as those employed...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Four
Prepared by the Subcommittee on Offshore Technology Conference Support of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Three
Prepared by the Subcommittee on Offshore Technology Conference Support of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Two
Prepared by the Program Committee, Offshore Technology Conference, of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years
Prepared by the Subcommittee on Offshore Technology Conference Support of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Deep Freeze
In engineering, overcoming a failure can sometimes be more instructive than completing a project with unqualified success. Such was the case with the collapse and repair of a force main...

A Major Water Main Crossing of the Ohio River at Cincinnati
This presentation chronicles a major water main crossing of the Ohio River at Cincinnati. The project is of interest because it provides for the interstate sale of drinking water and technical...

Turning with the Wind
A 125-m high tower built at the site of the Glasgow Science Center in the United Kingdom required some innovative design methods. To reduce the aerodynamic effects imposed on the slender...

 

 

 

 